Beirut City Center
Location
Hazmieh
Owner
Majid Al Futtaim Properties
Consultant
Samir Khairallah and Partners
Project Characteristics
Built-up Area: 125000 m2
Hollow Core Slabs
Post Tensioned Beams
8 months Core Structure Target Completion
BLOM Branch
Location
Zalka
Owner
B.L.O.M.
Consultant
Yeretzian Associates
Project Characteristics
Diaphragm walls
Skylight
Built-up area, 4 floors: 2.500 m2
Duration: 17 months
Boueri Condominium
Location
Adma
Owner
Mr. Jean-Claude Boueiri
Consultant
Mr. Michel Daoud
Project Characteristics
Built-up area: 4.500m2
Swimming pool
Restaurants, shops, entertainment
Duration: 19 months
Byblos Bank Tower
Location
Beirut
Owner
Byblos Tower s.a.l.
Consultant
Samir Khairallah & Partners
Project Characteristics
Built-up Area: 20000 m2
Building Structure
Byblos Bank Headquarters
30 Stories
Duration: 14 months
Dbayeh 526
Location
Dbayeh
Owner
Cool 5
Consultant
FaR Architects
Project Characteristics
Built-up Area: 1200 m2
3 Floors
Post Tensioned Slab
8 months target completion
Droguerie de l'Union
Location
Hadath
Owner
Droguerie de l'Union
Consultant
Mr. Robert Mikaelian
Project Characteristics
Pharmaceutical Office Bldg
Built-up area, 10 floors:3.500 m2
Duration: 14 months
Hotel Phoenicia Intercontinental Phase 1
Location
Beirut
Owner
Societe des Grands Hotels du Liban
Consultant
Mr. Joseph P. Karam
Project Characteristics
Concrete works
Hotel Phoenicia Intercontinental Phase 2
Location
Beirut
Owner
Societe des Grands Hotels du Liban
Consultant
Mr. Joseph P. Karam
Project Characteristics
28 Stories Building
Floor area 700m2
Concrete Structure Erection: one week per floor
Three Hundred Rooms
Swimming Pool
Restaurants, etc.
Duration: 21 months
Joseph E. Tabet Building
Location
Riad El-Solh Square
Owner
Joseph Tabet
Consultant
Ferdinand Dagher
Project Characteristics
8 Stories: 1200m2 each
Lebanese Largest Building in the 1960s
Marc I Office Building
Location
Sin El Fil
Owner
Marc I s.a.l.
Consultant
Erga Group
Project Characteristics
18 Floors
Structural, Architectural and MEP works
Pages
Algorithm
Location
Zouk
Owner
Algorithm
Consultant
Mr. Robert Mikaelian
Project Characteristics
Production Unit (Cephalosporin)
Climate Control (400m2): Temperature, Humidity and Pressure
Duration: 9 months
Lebanese Cement Factory
Location
Chekka
Owner
Societe des Ciments Libanais
Consultant
H. Trachsel & J.Schibli AG Olten, Switzerland
Project Characteristics
Total area: 52 600m2
Continuous works from 1966 until 1988
Main factory and two extensions
5 cylindrical silos: D=25m; H=62.8m; Capacity=20000m3 each
VSL cylindrical and square slip forming
VSL post-tensioning system
Power Plant
Location
Jieh
Owner
Electricte du Liban - E.D.L.
Consultant
Brown Boveri & Co., Dar Al - Handassah
Project Characteristics
Main Buildings
Transformers Posts
Pumps Stations
Metal Structure
Duration: 30 months
Gemmayzeh Village - UNDER CONSTRUCTION
Location
Beirut
Owner
Conseil et Gestion Immobilere (CGI)
Consultant
Samir Khairallah and Partners
Project Characteristics
Phase 1 Sub-structure
Waterproofing works (PVC double layer)
Structural, Electrical and Mechanical works
Concrete Quantities: 28,000 m3
Contract Duration: 16 Months
K Villa
Location
Bikfaya
Owner
Private
Consultant
Mr. Pierre Bassil
Project Characteristics
Built-up Area: 2,100 m2 over three floors
Land: 10,000 m2
Circular water tank: 1,100 m3
Swimming Pool
Tennis Court
Concrete fence 400 ml
Landscaping
Duration: 18 months
Mtayleb 167 - UNDER CONSTRUCTION
Location
Mtayleb
Owner
Shammas Investment
Consultant
Madkour Architects
Project Characteristics
7 floors of 510 m2
Mixed used building - Residential and Commercial
Post tension slabs
Duration: 15 months
N Villa
Location
Beit Mery
Owner
Private
Consultant
Mr. Nabil Azar
Project Characteristics
Built up area: 1,900 m2
Land: 7,000 m2
Swimming pool
Fences 300 ml
Water tank 600 m3
Landscaping
Duration: 20 months
S Residence
Location
Rabieh
Owner
Private
Consultant
FaR Architects
Project Characteristics
Villa renovation
Guest House
Beirut Harbor Warehouses
Location
Beirut
Owner
Port de Beyrouth
Project Characteristics
10 Warehouses
40m Span
Height 9m
East Entrance Bridge Phase 1
Location
Beirut
Owner
Conseil Executif des Grands Projets de la ville de Beyrouth
Consultant
Mr. Antoine Salame (Gicome)
Project Characteristics
Bridge/Parking
1.500m Length
Reinforced Concrete 35000 m3
Prefab prestressed Concrete 10000 m3
Diaphragm walls 3000 m2
Duration: 32 months
East Entrance Bridge Phase 2
Location
Beirut
Owner
Conseil Executif des Grands Projets de la Ville de Beyrouth
Consultant
Mr. Antoine Salame (Gicome)
Project Characteristics
East Access Bridge L= 350m
West Access Bridge L=200m
Rehabilitation
Duration: 16 months
P2 Bridge
Location
Maameltein
Owner
Conseil Executif des Grands Projets
Consultant
Mr. Antoine Salame ( Gicome)
Project Characteristics
Span Length: 70m
Span Height: 30m
Bridge Length: 120m
Duration: 15 months
P3 Bridge
Location
Maameltein
Owner
Conseil Executif des Grands Projets
Consultant
Mr. Antoine Salame (Gicome)
Project Characteristics
Span Length: 105m
Span Height: 71m
Bridge Length: 192m
Duration: 18 months